PL254 LEPARD 1 HYDRAULIC FRACTURING ACTIVITIES COMPLETION REPORT STAGES 1 - 5

URL: https://geoscience.data.qld.gov.au/dataset/cr152849

A maximum 40 people on site. Frac equipment included up to 8 pumps, 5 water tanks, 2 blenders, 1 mountain mover/ proppant loader, 1 high pressure manifold, high pressure treating lines, 6 trucks on site, 3 temporary office/containers. Five conventional stimulations were undertaken of the volumes and type specified within this report.