Yellowbank 9 Well Completion Report

URL: https://geoscience.data.qld.gov.au/dataset/cr123566

Yellowbank 9 was drilled within the 100% Denison Gas operated PL43 located within the Denison Trough sub-basin of the greater Bowen Basin in southeast Queensland. Yellowbank 9 was drilled as a gas appraisal well, designed to evaluate the Staircase Sandstone which demonstrated moveable hydrocarbons at sub-commercial rates on DST at the nearby Yellowbank 6 well. The well was interpreted to have successfully appraised gas within the Staircase Sandstone target interval. Evaluation incorporated good mud gas shows of up to 759/250 units observed upon drilling consistent with the offset Yellowbank 6 well where DST#3 recovered GTS and petrophysical interpretation of the logs indicated 23.01m net gas pay over an 89.35m gross interval. 5 ½” production was set at 1538.2mRT and cemented back to surface. The well was suspended as a gas well and the rig released on the 15th October 2020 pending fracture stimulation and completion at a later date.

Data and Resources

This dataset was harvested

Additional Info

Field Value
Source https://geoscience.data.qld.gov.au/dataset/cr123566
Author GSQOpenData@resources.qld.gov.au
Maintainer GSQOpenData@resources.qld.gov.au
Version 1.0
Last Updated November 8, 2023, 15:29 (AEST)
Created November 8, 2023, 15:29 (AEST)
harvest_object_id bd65c936-1acf-4553-93fb-7820df5586f4
harvest_source_id ab92c79e-7b6d-4ae9-b70b-a0e84e78006b
harvest_source_title Geoscience Harvester